Dangerous crossings over a damaged bridge in Gouripur; repairs could take six months
- Update Time : 11:23:05 am, Saturday, 28 November 2026
- / 5 Time View
The Bailey bridge over the Balua River, located near the food warehouse in Gouripur municipal town, Mymensingh, has fallen into a dilapidated state. The iron decking of the bridge has broken in several places, creating large, gaping holes. Despite being in a hazardous condition for a long time, the bridge continues to be used daily by both passengers and vehicles transporting goods. Locals report that minor accidents have already occurred. They fear that the dense winter fog could lead to major accidents and potential loss of life.
On-site observations reveal that the iron decking has broken and collapsed, leaving deep holes at the bridge’s connection points and in the middle section. In some areas, the decking has corroded, while in others, it has completely broken through and caved in. Vehicles such as easy-bikes, auto-rickshaws, tractors, motorcycles, and bicycles cross this narrow bridge at great risk. When one vehicle enters the bridge, those coming from the opposite direction are forced to wait. Managed by the Local Government Engineering Department (LGED), this bridge serves as a vital link between the upazila headquarters and the unions of Achintapur, Maoha, Sahanati, and Bokainagar.
Every day, students, farmers, business owners, and people from various walks of life from these areas rely on this bridge for travel. The Bailey bridge, which spans approximately 70 feet, was constructed in 1999. Given its long-standing dangerous condition, locals have staged various protests—including human chains—demanding its repair. Although the bridge underwent repairs in 2015 and 2017, the underlying issues remain unresolved. Kutub Uddin, a regular user of the bridge, stated, “Crossing this bridge is now extremely dangerous.” “Minor accidents have occurred here quite recently.”
“With the arrival of dense winter fog, there is a high risk of a major accident.” In the public interest, the bridge should have been declared unfit for use and repaired long ago. Resident Mohammad Sakhawatullah stated that the bridge is so narrow that two vehicles cannot pass across it simultaneously. This is the only route available to them. He urged the relevant authorities and the minister to take immediate steps to repair the bridge before a major accident or loss of life occurs. Expressing concern for his children’s safety, Mahendra Rabidas, a resident of the jail area, said, “My two children are in the fifth and sixth grades.”
“They have to cross this dilapidated bridge every day to get to school. We live in constant fear because of this.” “Often, pedestrians and students get their feet stuck in the holes, leading to accidents.” One student mentioned that while crossing the bridge on a bicycle, his tires have burst two or three times after hitting the broken iron decking. He even suffered a cut on his toe after his foot slipped into one of the holes. He demanded that the bridge be repaired immediately.
Shamim Khan Pathan, a resident of Bokainagar Pathanpara, and Khokon, from the Manikdi area, explained that because the decking in the middle and along the sides of the bridge is broken, the risk of an accident increases whenever two vehicles attempt to cross at the same time. They are forced to travel across it in a state of constant anxiety every day. They expressed concern that this risk will only intensify during the dense winter fog. When asked about the matter, Aminul Islam, the Gouripur Upazila Engineer for the Local Government Engineering Department (LGED), stated that a proposal for the construction of a new bridge has already been submitted to the relevant project authorities. Official procedures regarding this are currently underway.
Once approved by the Executive Committee of the National Economic Council (ECNEC), the tender process will begin, followed by the construction of the new bridge. However, as the construction of a new bridge will take time, when asked whether the broken decking of the existing, hazardous Bailey bridge would be repaired on an urgent basis, Upazila Engineer Aminul Islam replied, “Building a new bridge will take some time.” “However, in the public interest, an initiative will be taken to repair the existing bridge, in consultation with the District Engineer.” He mentioned that even after allocating the necessary funds and completing the required official procedures, the repair work could take approximately six months to finish.
Regarding this, Gouripur Upazila Executive Officer (UNO) Afia Amin Pappa stated that since the bridge falls under the jurisdiction of the Local Government Engineering Department (LGED), the Upazila administration does not have the authority to allocate funds for it directly.
He added that he would look into the matter, consult with the relevant parties, and provide an update later. Meanwhile, a proposal for the construction of a new bridge is currently awaiting approval. Even if an initiative is taken to repair the existing bridge, the work could take up to six months to complete. There is no word yet on what specific measures will be taken to ensure the safe passage of the public across this hazardous bridge during this period. Residents have demanded urgent repairs to the bridge to prevent any major accidents.




















